
Wheelbase changes engineered and certified
Lengthen a cab-chassis for a longer body or shorten it for tighter work. Cut, extended or shortened by certified welders and signed off with the certification a wheelbase change needs.
Wheelbase Shortening & Extension for the work you do
A new body, a crane or a different job often needs a different wheelbase. Transweld extends and shortens truck chassis for every make. We confirm the dimensions, axle loads and certification route first, then cut, join and reinforce the rails, move the axles and alter the propshaft, air lines, wiring and fuel lines to suit. The certifier inspects the work, and a wheelbase change also needs brake certification, which we arrange with the LT400.
- Chassis extensions for a longer body or a crane
- Shortening for manoeuvrability or a shorter body
- Propshaft, air lines and wiring altered to match
- Brake certification and LT400 arranged
At the Transweld workshopWhat goes into every build
Six things every wheelbase change from our workshop gets as standard or as a planned option.
Extend
Lengthen a cab-chassis to carry a longer body, a crane or more freight.
Shorten
Shorten the wheelbase for tighter turning or a shorter body.
Engineered first
Dimensions, axle loads and the certification route confirmed before any cut.
Certified welding
Rails joined and reinforced by welders qualified for structural work.
Driveline and services
Propshaft, air lines, wiring and fuel lines altered to suit the new length.
Brake certification
A wheelbase change needs brake certification, which we arrange with the LT400.
Spec your wheelbase change
Tick the options you are considering. Your selection travels into the quote form, so we price the build you actually want.

Rails cut, joined and reinforced by certified welders to the new length.
Rear overhang extended or shortened to suit the body.
Propshaft, air lines, wiring and fuel lines altered to match.
Axles moved to the new wheelbase, with brake certification arranged.
Tap the orange points to see what is built in
What we confirm at quote
Every build is engineered to the chassis. These are the parameters we settle with you before any steel is cut.
Payload, axle loads and dimensions are checked against the chassis rating and the Vehicle Dimensions and Mass Rule for your combination.
- Suits
- Rigid trucks and tractor units of any make
- Work
- Wheelbase and rear overhang extended or shortened
- Includes
- Propshaft, air, electrical and fuel lines altered to suit
- Certification
- Chassis modification certified (LT400) with brake certification
- Lead time
- Confirmed at quote
- Built in
- Onehunga, Auckland
From the workshop
Real photos from 1 Edinburgh Street, Onehunga. See the full gallery
Wheelbase Shortening & Extension FAQs
The questions operators ask before they order.
Does a wheelbase change need certification?
Yes. A chassis modification is certified by an NZTA-appointed certifier, and a wheelbase change also needs brake certification. We build to the certifier's requirements and arrange both.
Why extend a wheelbase?
Usually to carry a longer body, fit a crane or share the load better between the axles.
Why shorten a wheelbase?
To turn tighter in city streets and yards, or to suit a shorter body or tipper.
How long does a wheelbase change take?
It depends on the change and what else is being fitted. We confirm the timeline at quote.
Tell us about your wheelbase change
A few details are enough to start. We will call or email back with questions, then send a scope with a price and a build date.
- Reply within one working day
- Clear scope, price and build date
- Drawings and photos welcome





